Projects have been Undertaken By AGHCO – Since 1993

No.Type of ProjectsProvinceDistrictVillageStart DateEnd DateFounded ByBuget
1Cleaning CanalNangarharJalalabadBehsud15/08/1993 14/01/1994ANH/GTZ-Germany22000 U$
2Reconstruction of HospitalNangarharJalalabadP. Health Hosp. 01/09/1993 30/03/1994ANH/GTZ-Germany 98600 U $
3Repairing of Nangarhar High SchoolNangarharJalalabadCenter 15/09/1993 10/04/1994ANH/GTZ-Germany 31500 U $
4Repairing of HospitalNangarharJalalabadUniversity Hosp 30/09/1993 01/04/1994ANH/GTZ-Germany 34000 U$
5Repairing of Alai High School (Girl school)NangarharJalalabadCenter 25/09/1993 15/04/1994ANH/GTZ-Germany 25400 U$
6Construction of Kitchen in Nang. Medical FacultyNangarharJalalabadMedical Faculty 12/09/1993 11/11/1994ANH/GTZ-Germany 76000 U$
7Canal CleaningNangarharSurkhrudMiran 10/10/1993 09/12/1993ANH/GTZ-Germany 23000 U$
8Reconstruction of High SchoolNangarharKhogyaniAhmad Khil 20/10/1994 19/12/1994ANH/GTZ-Germany 88500 U$
9Repairing of RoadNangarharKhogyaniAhmad Khil 20/10/1994 19/12/1994ANH/GTZ-Germany 35000 U$
10Construction of WashKunarNarhangNarang 15/10/1993 15/02/1994ANH/GTZ-Germany 89350 U$
11Reconstruction of BuildingKunarAssadabadCenter 15/11/1993 14/03/1994ANH/GTZ-Germany 26700 U$
12Reconstruction of BuildingKunarAssadabadCenter 15/08/1993 30/02/1994ANH/GTZ-Germany 76800 U$
13Reconstruction of Water IntakeKunarAssadabadKirhala 01/11/1993 15/02/1994EEC 33000 U$
14Canal CleaningKunarAssadabadWata poor 01/10/1993 15/01/1994ANH/GTZ-Germany 55000 U$
15Road RepairingKunarMarawaraMarawarra 01/11/1993 15/03/1994ANH/GTZ-Germany 34500 U$
16Reconstruction of BuildingLaghmanMehterlamCenter 15/09/1993 14/02/1994ANH/GTZ-Germany24800 U$
17Repairing of Mehterlam HospitalLaghmanMehterlamCenter 15/10/1993 30/03/1994ANH/GTZ-Germany58900 U$
18Repairing of Mehterlam Water Supply SystemLaghmanMehterlamCenter 01/11/1993 14/04/1994EEC78600 U$
19Recons. of Roshan High SchoolLaghmanMehterlamCenter 15/08/1993 15/01/1994ANH/GTZ-Germany23450 U$
20Reconstruction of BridgeQandaharCenterBaghi Pur 01/08/1993 02/01/1994ANH/GTZ-Germany37800 U$
21Construction of MosqueQandaharCenterBaghi Pul 01/10/1993 30/03/1994ANH/GTZ-Germany35000 U$
22Reconstruction of Primary SchoolQandaharBilandiBilandi 10/08/1993 30/01/1994ANH/GTZ-Germany78,800 $
23Repairing of Mechanical SchoolQandaharCenterCenter 15/08/1993 15/02/1994ANH/GTZ-Germany67,500 $
24Repair of Mechanical SchoolQandaharCenterCenter 10/09/1993 20/02/1994ANH/GTZ-Germany44,000 $
25Reconstruction of Mishriqi High SchoolQandaharCenterMishriqi 10/08/1993 01/03/1994ANH/GTZ-Germany45,000 $
26Kariz CleaningQandaharMaiwandMaiwand 20/11/1993 15/04/1994ANH/GTZ-Germany10,500 $
27Reconstruction of Factory BuildingQandaharCenterSelow 01/09/1993 01/04/1994ANH/GTZ-Germany53,340 $
28Reconstruction of BridgeQandaharSpen BoldakSpen Boldak 05/08/1993 25/04/1994ANH/GTZ-Germany42,600 $
29Reconstruction of Electricity DameQandahar FILKO 04/10/1993 17/04/1994ANH/GTZ-Germany23,400 $
30Canal CleaningQandaharArghandabArghandab 12/09/1993 22/04/1994EEC8,800 $
31Reconstruction of Nisaji FactoryQandaharCenterNisagi 27/10/1993 01/04/1994ANH/GTZ-Germany23,000 $
32Reconstruction of High SchoolQandaharCenterAlbironi 13/11/1993 15/02/1994ANH/GTZ-Germany67,000 $
33Reconstruction of Primary SchoolQandaharCenterAir Port 01/12/1993 30/04/1994ANH/GTZ-Germany44,200 $
34Repairing of Electrical SystemQandaharCenterBagh-e-Pul 01/08/1993 02/01/1994ANH/GTZ-Germany11,200 $
35Repairing of Water Supply systemQandaharCenterCenter 10/09/1993 21/02/1994ANH/GTZ-Germany23,000 $
36Reconstruction of primary schoolQandaharPanwaiPanwai 15/10/1994 14/12/1994ANH/GTZ-Germany67,400 $
37Cleaning of main canalsQandaharCenterZone # 1,2…7 25/09/1994 24/12/1994ANH/GTZ-Germany33,000 $
38Reconstruction of HospitalQandaharCenterCenter 15/08/1993 30/04/1994ANH/GTZ-Germany42,800 $
39Food DistributionKabulCenterCenter 25/04/1994 15/05/1994ANH/GTZ-Germany12,000 $

 

AGHCO

Project have been undertaken By AGHCO From 1994 To 1995

40

Wash Construction

Laghman

Mehterlam

Harmool

01/11/1994

31/01/1995

FAO

32,500 $

41

Wash Construction

Laghman

Alingar

Kanda

15/03/1994

31/05/1995

FAO

12,800 $

42

Construction of Primary School

Laghman

Alishing

Shamsakhil

15/08/1994

15/11/1996

UNHCR

32,500 $

43

Flood Control

Laghman

Mehterlam

Gulbilla

05/03/1996

03/05/1996

WFP

23,000 $

44

Road Repairing

Laghman

Mehterlam

Gomain

15/11/1995

15/01/1996

WFP

43,300 $

45

Road Repairing

Laghman

Mehterlam

Ghundi

15/11/1995

15/01/1996

WFP

34,900 $

46

Road Repairing

Laghman

Mehterlam

Mohamandpoor

28/12/1995

27/03/1996

WFP

20,000 $

47

Road Repairing

Laghman

Alingar

Shekh Sahib

01/03/1996

01/07/1996

WFP

45,800 $

48

Road Repairing

Laghman

Alishing

Alishing

02/03/1996

01/07/1996

WFP

35,000 $

49

Wash Reconstruction

Laghman

Alishing

Alishing

01/06/1996

30/07/1996

UNHCR

6,610 $

50

Construction of Primary School

Kunar

Nangalam

Lichalam

15/08/1995

12/12/1995

UNHCR

31,813 $

51

Road Repairing

Kunar

Nangalam

Nangalam

08/03/1996

07/07/1996

WFP

24,000 $

52

Road Repairing

Kunar

Nangalam

Kandaro

08/03/1996

22/05/1996

WFP

15,400 $

53

Road Repairing

Kunar

Peach

Gondail

08/03/1996

07/06/1996

WFP

18,900 $

54

Road Repairing

Kunar

Sarkano

Pashad

01/01/1996

01/05/1996

WFP

19,000 $

55

Road Repairing

Kunar

Sarkano

Ganjgal

15/10/1995

15/10/1995

WFP

22,000 $

56

Road Repairing

Kunar

Sarkano

Baharabad

15/11/1995

15/01/1996

WFP

13,800 $

57

Food Distribution

Kunar

Assadabad

Center

01/11/1995

31/04/1995

WFP

16,700 $

58

Drainage Structure

Laghman

Mehterlam

Dewa

20/08/1996

20/02/1997

UNOPS

29,861$

59

Construction of Primary School

Kunar

Sarkano

Ganjgal

16/07/1996

18/03/1997

UNHCR/WFP

9,545 $

60

Road Repairing

Khost

Center

Kotki Shaheed

05/03/1996

17/05/1996

WFP

43,600 $

61

Road Repairing

Khost

Center

Kloop

 20/07/1996

04/10/1996

WFP

32,000 $

62

Construction of Health Clinic

Khost

Spira

Spira

 21/04/1996

20/07/1996

UNHCR/WFP

56,000 $

63

Road Repairing

Khost

Spira

Spira

 10/06/1996

09/12/1996

WFP

13,500 $

64

Construction of Primary School

Nooristan

 

Archino

 01/08/1996

01/11/1996

UNHCR/WFP

14,000 $

65

Women Tailoring Training project

Nangarhar

Jalalabad

Behsud

 10/08/1996

09/06/1997

WFP

16,700 $

66

Construction of Health Clini

Paktia

Sayed Karam

Sayed Karam

 10/06/1996

11/09/1996

UNHCR/WFP

6,797 $

67

Reconstruction of High School

Nangarhar

Surkhrud

Faqrollah

 20/04/1996

29/05/1997

UNHCR/WFP

20,000 $

68

Repairing of Road and Construction of Culverts

Nangarhar

Surkhrud

Shamshapoor

 16/08/1996

27/05/1997

UNHCR/WFP

5,000 $

69

Construction of Indeterminate Type Bridge

Laghman

Surkhakan

Kathz Aziz Khan

 15/06/1996

28/07/1997

UNHCR/WFP

9,890 $

70

Const. of Teaching Block in Nang. University

Nangarhar

Surkhrud

Daronta

 29/04/1997

28/08/1997

UNHCR/WFP

15,000 $

71

Feeding Program in Nang. Children Hosp.

Nangarhar

Jalalabad

P. H. Hospital

 01/05/1997

01/11/1997

WFP

23,400 $

72

Malnutrition Aid Program in Nang. Children Hosp.

Nangarhar

Jalalabad

P. H. Hospital

 19/06/1997

18/12/1997

WFP

10,000 $

73

Feeding Program in Mehterlm Hospital

Laghman

Mehterlam

P. H. Hospital

 13/06/1997

12/12/1997

WFP

2,500 $

74

Feeding Program in Assadabad Hospital

Kunar

Assadabad

P. H. Hospital

 12/06/1997

12/02/1998

WFP

8,900 $

75

Malnutrition Aid Program in Nang. Children Hosp.

Nangarhar

Jalalabad

P. H. Hospital

 09/02/1998

08/05/1998

WFP

10,400 $

76

Kariz Rehabilitation for the repatriated refugees

Paktia

Wazi Zadran

Mirajan, Lota

 25/10/1997

31/05/1998

UNHCR

7,000 $

77

Shelter Assistance Program

Paktia

Wazi Zadran

Mirajan, Lota

 25/10/1997

31/03/1998

UNHCR

8,700 $

78

Repairing of MCH Clinic

Logar

Pul-e-Alam

Center

 26/04/1998

25/07/1998

UNICEF

9,000 $

79

Repairing of UNOCHA Banker

Kabul

Center

Center

 10/08/1998

19/10/1998

UNOCHA

29,8961$

80

Feeding Program in Nang. Children Hosp.

Nangarhar

Jalalabad

P. H. Hospital

 05/01/1998

04/01/1999

WFP

9,445 $

81

Siphon Construction

Kabul

Sorobi

Tezeen

 06/08/1998

05/10/1998

UN-OPS

34,000 $

AGHCO

Projects have been Undertaken By AGHCO From 1998 To 2000

82

Improvement of Shallow wells

Paktia

Sayed Karam

Mush

 05/10/1998

 15/12/1998

IRC

23000 U$

83

Shelter Assistance for 80 families

Paktia

Sayed Karam

Mush

 02/06/1998

 01/08/1998

UNHCR

22500 U$

84

Repairing of Public Health Hospital

Logar

Pul-e-Alam

Center

 30/11/1998

 30/03/1999

UNICEF

84500 U$

85

Construction of 20 Public Latrines

Kabul

Center

Center

 

 

UNICEF

33000 U$

86

Rehabilitation of Road

Kabul

Sorobi

Tezeen

 01/04/1999

 01/09/1999

UN-OPS

45000 U$

87

Rehabilitation of 4 Karizes

Paktia

Sayed Karam

Mush

 15/07/1999

 15/10/1999

IRC

6700 U$

88

Malnutrition Aid Program

Nangarhar

Jalalabad

P. H. Hospital

 09/01/1999

 09/01/2000

WFP

5600 U$

89

Feeding Program

Nangarhar

Jalalabad

P. H. Hospital

 09/01/1999

 09/01/2000

WFP

8000 U$

90

Shelter Project for the repatriated families

Nangarhar

Chaparhar

Ghulam Dag

 08/12/1999

 07/02/2000

UNHHCR

55600 U$

91

Shelter Project for the repatriated families

Kunar

Sarkano

Sarkano

 10/12/1999

 09/02/2000

UNHHCR

45600 U$

92

Cleaning of Drains for rehab. of Land

Nangarhar

Batikot

Mashwani

 15/01/2000

 15/04/2000

WFP

14000 U$

93

Malnutrition Aid Program

Nangarhar

Jalalabad

P. H. Hospital

 01/01/2000

 31/12/2000

WFP

18000 U$

94

Feeding Program

Nangarhar

Jalalabad

P. H. Hospital

 01/01/2000

 31/12/2000

WFP

US$ 6797 

95

Rehabilitation of Road

Laghman

Mehterlam

P. H. Hospital

 01/07/2000

 15/08/2000

WFP

US$ 23000

96

Shelter project for the repatriated families

Nangarhar

Batikot

Ambar Khana

 01/06/2000

 15/08/2000

UNHCR

US$ 55000

97

Rehabilitation of Road

Nangarhar

Chaparhar

Sra Qala

 20/09/2000

 13/12/2000

WFP

US$ 19890

98

Rehabilitation of two Karizes

Nangarhar

Chaparhar

Ghulam Dag

 20/09/2000

 13/12/2000

WFP

56000 U$

99

Rehabilitation of Canals and Springs

Nangarhar

Rodat

Mufti Qala

 25/09/2000

 04/01/2001

WFP

16500 U$

100

Rehabilitation of Kariz

Nangarhar

Rodat

Kuza Qala

 25/09/2000

 04/01/2000

WFP

13500 U$

101

Rehabilitation of Jabo Landi wala and Pass Wala

Nangarhar

Rodat

Jabo

 25/09/2000

 04/01/2000

WFP

15600 U$

102

Rehabilitation of Canal

Nangarhar

Surkhrud

Naghrak

 26/10/2000

 13/12/2000

WFP

28000 U$

 

103

Rehabilitation of 11 Karizes + 2 Springs

Nangarhar

Hesarak

Different

20/09/2000

14/12/2000

WFP

33500 U$

104

Rehabilitation of 7 Karizes

Nangarhar

Hesarak

Different

20/09/2000

14/12/2000

WFP

33500 U$

105

Drilling and Improvement of 120 Wells

Khost & Paktika

Different

Different

25/11/2000

20/02/2001

UNICEF

88500 U$

106

Rehabilitation of 28 Karizes

Kabul

Khak-e-Jabar

Different

21/10/2000

04/05/2001

UN-OPS

32000 U$

107

Improvement in the Internal Women Ward of

Laghman

Mehterlam

P. H. Hospital

07/12/2000

10/05/2001

UNICEF

41000 U$

108

Rehabilitation of 3 roads and 6 Canals

Nangarhar

Shirzad

Toto, Petla

11/02/2001

10/06/2001

WFP

6700 U$

109

Rehabilitation of Kariz

Nangarhar

Hesarak

Lajgar

17/02/2001

08/05/2001

WFP

5800 U$

110

Shelter project for 65 repatriated families

Nangarhar

Hesarak

Different

27/02/2001

18/05/2001

UNHCR

8900 U$

111

Free Food Distribution Project

Nangarhar

Rodat

Different

01/10/2001

30/03/2002

WFP

55600 U$

112

Water-Sanitation Program (10 Bore wells

Laghman

Different

Health Clinics

01/05/2001

30/06/2001

UNICEF

55600 U$

113

Rehabilitation of Water Intake and a Kariz

Nangarhar

Chaparhar

Ghulam Dag

17/06/2001

16/09/2001

WFP

14000 U$

114

Malnutrition Aid Program for 400 under

Nangarhar

Jalalabad

AGHCO Children

01/01/2001

30/12/2001

WFP

26600 U$

 

AGHCO

Projects have been Undertaken By AGHCO From 2001 to 2002

115

Hospital Feeding Program for 30 patients

Nangarhar

Jalalabad

AGHCO Children

 1/01/2001

 0/06/2001

WFP

12500 U$

116

Medical activities in Mehterlam Poly Clinic

Laghman

Mehterlam

Center

 4/08/2000

Continued

UNICEF

12500 U$

117

Water Supply Project (120 bore wells, 60 in

Khost and

Different

Different

 1/11/2001

 5/01/2002

UNICEF

85500 U$

118

Rehabilitation of 6 karizes, 3 canals and

Nangarhar

Hesarak

Lajgar, Khanjur,

 3/08/2001

 2/11/2001

WFP

8500 U$

119

Rehabilitation of 91 karizes and road

Ghazni

Jaghato

Different

 1/09/2001

01/12/2001

WFP

49000 U$

120

Rehabilitation of 8 karizes and road

Kabul

Shakardara

Different

 0/09/2001

 9/12/2001

WFP

6700 U$

121

Emergency Free food distribution

Ghazni

Zana khan

Different

 1/01/2001

 1/04/2001

WFP

5600 U$

122

Const.of water and sanitation facilities for

Nangarhar

Jalalabad

Different

 7/02/2002

 8/05/2002

UNICEF

8800 U$

123

Rehabilitation of karizes and canals

Nangarhar

Shirzad

Toto, Petlau

27/05/2002

26/08/2002

WFP

24600 U$

124

Malnutrition Aid Program for 400 under

Nangarhar

Jalalabad

AGHCO Children

 1/01/2002

 0/12/2002

WFP

48600 U$

125

Hospital Feeding Program for 30 patients

Nangarhar

Jalalabad

AGHCO Children

 1/01/2002

 0/06/2002

WFP

18600 U$

126

 Rehabilitation of Karizes and Canals

 Ghazni

 Malistan

 62 viliages

24/04/2002

21/07/2002

WFP

14500 U$

AGHCO

Projects have been Undertaken By AGHCO From 2002 To 2003

127

Running of water supply system

Nangarhar

Jalalabad

Hesar,Shahi Camp

01/01/2003

30/01/2003

UNHCR

US $ 909

128

Winterization Project (Canals, Karizes  & Road Rehabilit.

Nangarhar

Hesarak

Ghuagiza, Khanjur

10/11/2002

9/01/02

WFP

34600 U$

129

Shelter Project for 150 Repatriated Families 

Nangarhar

Rodat

Kan, Zakhil & Qatraghai

15/07/2002

14/09/2002

InterSoS

US$ 3840

130

Shelter Project for 183 Repatriated Families

Kunar

Kuz Kunar

Bodialai & Islampoor Qala

07/10/2002

06/01/2003

InterSoS

US$ 4680

131

Water Sanitation and Hygiene Education

Nangarhar

Rodat

Kan, Mazina and Roghano

20/10/2002

30/12/2002

UNICEF

US$ 5490

132

Nursery and Tree Plantation

Zabul

Centre

Centre of Shahri Safa

15/06/2002

15/12/2002

WFP

US$ 2795

133

Supplementary Feeding Program for Malnourished children, pregnant and lactating mothers

Nangarhar

Jalalabad

Children Hospital

01/01/2003

31/03/2003

WFP

US$ 12700

134

Repairing work in UNICEF Office

Nangarhar

Jalalabad

Center

15/02/2003

14/04/2003

UNICEF

US$ 7200

135

Road Repairing and Bus Shelter

Kandahar

City #6

Bala Karz

01/07/2003

01/09/2003

UNDP

US$ 4325

136

Food for Education Project

Kandahar

City

City

01/12/2002

01/03/2003

WFP

US$ 13090

137

Food for Education Project

Kandahar

City

City

01/112003

31/12/2003

WFP

US$ 9521

138

Pipe Scheme Project

Kunar

Nary

Shinger

01/08/2003

01/11/2003

UNHCR

US$ 37300

139

Pipe Scheme Project

Kunar

Sarkano

Nawapas & Babar

01/08/2003

01/11/2003

UNHCR

US$ 11700

140

Reconstruction of Ghazni City Bridge

Ghazni

City

City

07/08/2003

07/11/2003

IOM

US$ 32276

141

Constitution Making Process

Khost, Kunar & Nooristan

All

All

07/01/2003

31/07/2003

Swiss Peace

US$ 74,362

142

Bore Wells and Water Supply

Laghman

Mehterlam and Alishang

16 Schools

05/01/2003

19/08/2003

WFP

US$ 8,500

143

Supplementary Feeding Program for Malnutrition Children and Lactating Mothers

Nangarhar

Jalalabad

Children Hospital

01/01/2003

31/12/2003

WFP

45680 U$

AGHCO

Projects have been Undertaken By AGHCO From 2003

144

FoodAC

Ghazni

Malistan

Shanideh

12/05/2003

04/08/2003

WFP

23500 U$

145

FoodAC

Ghazni

Zana Khan

Qalae Sabzi

12/01/2003

31/03/2003

WFP

2200 U$

146

5 Projects Road, School & Intake

Nangarhar

District #5

Different

01/01/2003

30/04/2003

UNAMA

US$ 273,810

147

Food For Education Project

Kabul

District #3

Nahia 1,8,11

06/05/2003

30/12/2003

WFP

US$ 48910

148

Food For Work

Ghazni

Zana Khan

Qale Sabzi

01/09/2003

01/12/2003

WFP

35500 U$

149

Water Supply Project

Paktika, Paktia & Khost

Different

Different

25/08/2002

15/04/2003

UNICEF

US$ 169,500

150

Water Sanitation Project

Kabul

Bagrami, Dehsabz & Kabul

Different

23/11/2002

14/10/2003

UNICEF

US$ 140,000

AGHCO

Recent Projects

AGHCO

From 2006 Up to 2017 onward

151 Food For Work Ghazni Malistan Shanideh 27/10/2003 27/01/2004 WFP 667000 U$
152 Support to Street & Working Children Kabul Center Dehboori & Shah Shaheed 11/01/2003 07/12/2004 Save the Children UK US$ 29,929
153 Running of Health Activities Paktika Urgon, Gayan, Shekhan, Pirkoti & Omna All 03/01/2004 11/01/2006 WHO/MoPH US$ 1.7 Million
154 Shelter Project Kunar Asad Abad & Khas Kunar All 16/05/2004 16/08/2004 UNHCR US$ 49,546
155 Construction of Nangaraj Girls Primary School Nooristan Nangaraj Center 27/05/2004 27/09/2004 GAGP Japan Embassy US$ 77,184
156 Construction of Puli Khumri Central Boys & Girls School Baghlan Puli Khumri Center 14/07/2004 13/11/2004 GAGP Japan Embassy US$ 89,726
157 Construction of Khwaja Kamli Wali Primary School Baghlan Puli Khumri Center 5/08/2004 5/11/2004 GAGP Japan Embassy US$ 89,726
158 Construction of  Nahri Karim Canal Laghman Qarghayee Center 29/09/2004 01/01/05 Embassy of Japan US$ 79,910.75
159 Construction of two Septic tanks Baghlam Baghalan district Baghalan 01/11/2004 31/11/2004 Embassy of Italian US$ 14,600
160 Rehabilitation of 2 Roads Ghazni Malistan Different 15/10/2004 15/01/2005 WFP 128000 U$
161 Rehabilitation of 40 Karizes Paktika Dela Different 15/10/2004 15/12/2004 WFP 15600 U$
162 Construction of Bbi Zainab Girls school Balkh Shulgra Different 8/11/2004 8/03/2005 Embassy of Japan US$89884
163 Construction of 6 km Road Nangrhar Batikoot Different 8/11/2004 8/03/2005 Embassy of Japan US$ 89836
164 Construction of Khwaja Bahaodin Primary school Balkh Balkh Different 22/12/2004 22/04/2005 Embassy of Japan US$89937
165 Construction of Saracha Ali Khan School Nangrhar Behsood Different 15/6/2005 15/10/2005 Embassy of Japan 89878,00 U$
166 Shor Aregh Afghani Primary school Jawzjan Shaberghan Different 14/12/2005 14/04/2005 Embassy of Japan US$92,431
167 Shelter Assistance for Returness and IDPs 660 families Nangarhar/ Kunar Different Different 01/04/2006 31/12/2006 UNHCR US$134,436
168 BPHS-Running of Health Activities Paktika Different Different 01/04/2006 Completed USAID/WHO/ MoPH US$76,374
169 Community Midwifery Education (CME) Project Paktia Central Different Completed USAID    23000 US$
170 Shelter Assistance Project for 475 Returnees Nangarhar/Kunar Different Different 01/05/2007 31/12/2007 UNHCR 146083.75 US$
171 Construction of Culverts and Protection Wall Nangarhar Batikot Sehpai Daman 05/09/2007 20/02/2008 Embassy of Japan US$ 85426
172 Construction of Culverts Balkh Nahri Shahi Baba Yadgar 05/09/2007 20/02/2008 Embassy of Japan US$ 80183
173 Shelter Assistance Project for 1170 Returnees Nangarhar/Kunar Different Different 01/05/2008 31/12/2008 UNHCR US$ 621477
174 Construction of Karamar(Shahbazi) 225 m Protection Wall Kunar Assadabad Center 27/10/2008 31/02/2009 Embassy of Japan 85787.86 U$
175 Construction of Kerara Shaheedano 140 M Protection wall and 10 Culverts Kunar Assadabad Center 5/01/2009 5/05/2009 Embassy of Japan GAGP Program 80035 U$
176 Shelter Assistance Project 2009 for 910 Returnees. Nangarhar/Kunar Different Different 01/05/2009 31/12/2009 UNHCR 828237 U$D
177 Construction of Four schools Ghor Dolina Different 01/05/2010 30/09/2010 Embassy of Japan GAGP Program 532156 U$D
178 Construction of BarNarang School Kunar Narang Narang 15/04/2010 30/08/2010 Embassy of Japan GAGP Program 95966 U$D
179 Shelter Assistance Project  2010 for 2253 Returnees Family in Eastern Region Nangarhar/Kunar Different Different 01/05/2010 31/12/2010 UNHCR 1257318 U$D
180 Shelter Assistance Project  2011 for 1069 ReturneesFamily in Eastern Region Nangarhar/Kunar Different Different 01/05/2011 31/12/2011 UNHCR 1020103 U$D
181 Shelter Project  2012 for 990 Returnees Family in Eastern Region Nangarhar/Kunar/Laghman Different Different 01/06/2012 31/12/2012 UNHCR 294124 U$D
182 School Construction  KasAzizkhan Reintegration site Laghmanr Qarghai KasAzizkhan 01/09/2012 31/12/2012 UNHCR 177827.24 U$D
183 Construction of School  Sheikhmesry Reintegration site Nangarhar Surkhroad Shiekhmesry 01/10/2012 31/12/2012 UNHCR 146908 U$D
184 Shelter  Assistance Project 2013 Nangarhar Different Different 01/08/2013 30/11/2013 UNHCR 195659 U$D
185 Shelter Project 2014 Eastern Region Different Deferent 15/02/2014 31/12/2014 UNHCR 277303 U$D
186 Shelter Project 2015 Eastern Region Different Different 15/May/2015 16/Sept/2016 UNHCR 172217 U$D
187 EiE AHF Project North Region Mazar Different Different 15/08/2019 14/08/2020 UNOCHA 24000 U$D
188 CBT (Cash based Transfer) Kabul PD-21 and P-2 Different 01/Mar/2022 31/Jul/2023 WFP  133,462 USD
189 CBT and Food (Cash based transfer) WFP Project Kabul PD.21 &22/Gardi, +7 districts Different 01/Jul/2022 30/Sep/2022 WFP  456,962 USD
190 CBT and Food (Cash based transfer) WFP Project Kabul PD-8 and Gardiz Different 01/Oct/2022 30/Jun/2023 WFP  501,492.95 USD
191 Emergency Response, sudden onset emergency project Khost, Paktiya, Paktika and Ghazni All districts of 4 provinces Different 01/Feb/2023 31/Dec/2023 WFP  47,155 USD
192 CBT and Food (Cash based transfer) WFP Project Paktiya All districts Different 01/Jul/2023 30/Jun/2024 WFP  662,723 USD
193 NGOs/CSOs Capacity Support Project Kabul PD-8 One Gozar 01/Jan/2024 30/Jun/2023 UNDP  50,000 USD